
Semi-custom and custom cabinetry sized for the new layout. Custom fillers, corners, and appliance openings. Soft-close hinges, full-extension drawer slides, and dovetail drawer boxes standard on every install.

Not new countertops on old cabinets. A full rebuild — structural engineering, slab leveling, panel upgrades, and every finish — under one contract from demo to punch list.
Most DFW kitchens are stuck in 1985. The galley wall runs parallel to the roof ridge and carries the ceiling joists. The slab has been moving for 40 years. The 100-amp panel has no room for the circuits a modern kitchen requires. Granite Guyz addresses all of it in sequence before a single cabinet is set.
A kitchen remodel in a 1975–1995 DFW home is not a surface project. The four structural obstacles below appear on nearly every job Granite Guyz takes in the DFW housing stock. Ignoring any one of them means the finish work fails within 12 to 24 months.
Structural engineering, temporary shoring, LVL or steel beam installation, and inspected connections. The galley kitchen conversion cannot proceed without this step done correctly.
Floor elevation survey across the kitchen footprint. Self-leveling compound or mortar bed correction before cabinets, tile, or island installation begins.
Full NEC-compliant circuit layout with dedicated runs for refrigerator, dishwasher, disposal, range, and countertop receptacles. Panel upgrade to 200 amps when required.
Camera scope of existing drain lines before demo. Slab cuts and drain rerouting for island sinks. PEX replacement of polybutylene supply lines while walls are open.
Semi-custom and custom cabinetry sized for the new layout. Quartz, granite, quartzite, and butcher block templated after cabinets are set and fabricated to exact dimensions.
Porcelain tile, LVP, or hardwood on the leveled slab. Backsplash after countertops are set. Recessed LED cans, under-cabinet task lighting, and pendant circuits over the island.
Most kitchens in DFW homes built between 1975 and 1995 share the same layout. A narrow galley corridor closed off from the living and dining areas by full-height walls on each side. One wall carries the upper and lower cabinets. The other holds the stove, sink, and refrigerator. A single fluorescent light strip in the center. No island. No pantry. No sightline to the rest of the house.
This was standard residential design for that era. Kitchens were functional workrooms, not gathering spaces. The wall separating the kitchen from the living room was designed to carry the ceiling joists above — making it load-bearing in the vast majority of 1970s and 1980s DFW homes. It runs parallel to the roof ridge and is often the longest wall in the house.
That wall is both the single biggest obstacle and the single most requested change in a DFW kitchen remodel. Getting there requires structural engineering and a permitted beam installation — not just a sledgehammer. Granite Guyz has removed hundreds of these walls. The process is methodical and follows the same four-step engineered sequence every time. Skipping any step results in a ceiling that sags, a roof structure that shifts, and drywall cracking throughout the space within months.
Beyond the wall, the same 1970s and 1980s home presents three additional structural challenges that appear in essentially every kitchen Granite Guyz guts in this housing stock. The slab has been moving on DFW clay for four decades. The electrical panel cannot support what a modern kitchen code requires. And the cast iron drain lines under the slab are corroding. None of these are cosmetic problems, and none of them can be patched after the cabinets are set.
The wall between kitchen and living room almost always carries the ceiling joists. Removal requires a licensed structural engineer, a permit, temporary shoring, and an inspected beam installation. Skip any step and the ceiling sags.
Expansive DFW clay has been pushing and pulling on the foundation for decades. The result is differential settlement across the kitchen floor — invisible until cabinets bind, tile cracks, and the island wobbles.
Original 100-amp panels and shared 15-amp circuits cannot support a modern kitchen. Current NEC requires dedicated circuits for every major appliance, GFCI and AFCI protection throughout, and often a 200-amp service upgrade.
Cast iron drain lines under 40-year-old DFW slabs are corroding. Scale buildup and pinhole leaks allow moisture into the soil beneath the foundation — accelerating the clay expansion cycle.
A licensed structural engineer evaluates the wall, roof load, and foundation. Specifies beam size and material (LVL, PSL, or steel I-beam) and post locations. Engineering plans run $1,500–$3,500 for a typical single-wall removal in DFW.
Before the wall comes out, temporary support walls go up on both sides. These carry the ceiling load while the permanent beam is installed. Shoring stays in place until the beam is set and the connections are inspected.
The wall is removed. The beam slides into place. Posts at each end transfer load to the foundation. If the slab has differential settlement at post locations, that must be addressed before the beam is set.
The city inspector verifies beam size, connections, post bases, and hardware. Granite Guyz does not close the ceiling until this inspection passes. The permit record stays with the house and protects future resale.
Removing a load-bearing wall is structural framing work, not demolition work. The distinction matters because structural framing work is engineered, permitted, and inspected. Demolition work is not. Granite Guyz follows a four-step process on every wall removal — no shortcuts, no uninspected work.
The most common mistake Granite Guyz sees in DIY and unlicensed kitchen remodels is a wall opening made without engineering. The contractor removes the wall, installs a header sized by experience rather than calculation, and the ceiling above begins to deflect. Within six to eighteen months, drywall cracks appear at the ceiling corners of the opening. The floor above bounces noticeably. The roof structure has shifted. Everything above the opening now needs to be addressed — and the cost to redo it on a closed house is two to three times what the engineering would have cost at the start.
The beam size is not a preference decision — it is an engineering calculation based on span length, tributary load, and roof dead and live load. A 12-foot opening in a 1,800 sq ft DFW home typically requires a PSL or LVL beam in the 5-1/4 × 14 to 5-1/4 × 16 range. A 20-foot opening may require a steel I-beam. The engineer specifies the material, size, connection hardware, and post requirements. Granite Guyz builds exactly to those drawings.
Granite Guyz runs a floor elevation survey before setting a single cabinet. DFW clay has been pushing and pulling on that slab for decades, and the kitchen is where the consequences show up most visibly. Here is what differential slab settlement does to each kitchen trade — and how it is addressed before it becomes a problem.
Base cabinets are built for level surfaces. Set them on an uneven slab and doors will not align, drawers will bind, and countertops will gap at the wall. Shimming compensates for about a quarter inch. Beyond that, the slab must be leveled before installation begins.
Large-format porcelain requires a flat substrate. Industry standard ANSI A108.02 allows no more than ⅛ inch variation over 10 feet for tiles with any edge longer than 15 inches. A 40-year DFW slab will not meet that standard without correction.
A stone-topped island weighs hundreds of pounds. That load on an uneven slab creates stress points in grout lines, tile, and cabinet bases. The island is also the most visible piece of the new kitchen — any unevenness is immediately apparent to everyone in the room.
Before Granite Guyz sets a single cabinet, we run a floor elevation survey across the kitchen slab. If the data shows differential settlement beyond acceptable tolerances, we level using self-leveling compound for corrections under ¾ inch or a mortar bed for deeper corrections.
For severe cases tied to active foundation movement, we coordinate with a foundation engineer to evaluate whether pier work is required before the floor can be addressed. That assessment happens before the project starts — not as a change order mid-demo.
For homeowners facing foundation issues that extend beyond the kitchen, Granite Guyz handles concrete slab foundation work as part of a larger project scope. A kitchen remodel built on a foundation that is actively moving will not stay level. We address the root cause before the finish work begins.
The soil beneath a 1984 DFW home has had 40 years of wet-dry cycles on montmorillonite and bentonite clay. Running a floor survey costs a fraction of what it costs to level the same cabinets twice.
The kitchen is the most electrically demanding room in the house — and the room where 1970s and 1980s DFW homes fall hardest behind current code. Every kitchen remodel Granite Guyz completes includes a full electrical assessment and a circuit-by-circuit code compliance upgrade.
The National Electrical Code (NEC) requires a kitchen to have at minimum two dedicated 20-amp GFCI-protected circuits for countertop receptacles, plus dedicated circuits for the refrigerator, dishwasher, disposal, and range. Every one of those circuits must have AFCI protection. The original 100-amp panel in a 1980s DFW home typically has a total of 20 breaker slots — most of which are already occupied — and provides nowhere near the amperage capacity the NEC circuit schedule above demands.
In most 1980s DFW homes, a kitchen remodel requires a 200-amp panel upgrade as a code-mandatory line item — not an optional upgrade. The panel upgrade happens during electrical rough-in, before drywall closes. Everything is inspected before the walls close. There is no option to install NEC-compliant kitchen circuits in a 100-amp panel that is already at capacity.
The comparison below shows what Granite Guyz typically finds behind the walls of a 1985 DFW kitchen — and what leaves the project permitted and inspected.
In most 1980s DFW homes, the existing 100-amp panel does not have enough slots or capacity to support these requirements. Granite Guyz upgrades electrical panels to 200 amps as part of a full kitchen remodel when the existing panel cannot handle the new load. This is not an upsell — it is what code requires when the existing infrastructure cannot support the scope of the work.
Unpermitted electrical work in a kitchen creates three specific problems at resale: the buyer’s inspector flags it, the lender may require remediation before closing, and the homeowner’s insurance carrier may deny claims from fires originating in the unpermitted wiring.
Granite Guyz pulls the electrical permit and passes the rough-in inspection before the walls close. The permit record stays with the house permanently.
Homes built from 1950 to 1990 in DFW may have Federal Pacific Stab-Lok panels with documented breaker failure rates and active fire risk. Most insurers will not write or renew a policy on a home with an FPE panel without remediation. If yours is FPE, the panel replacement happens during rough-in.
Kitchen plumbing in a 1980s DFW home runs under the slab. The drain line from the sink and dishwasher drops through the slab into a cast iron pipe buried in the soil beneath the foundation. Supply lines run through or under the slab to the sink location.
Cast iron drain lines in 40-year-old DFW homes are corroding. Interior walls develop scale buildup, root intrusion at joints, and pinhole leaks that allow moisture into the soil under the slab — accelerating the clay expansion cycle and making foundation movement worse. The homeowner sees none of this until the drain backs up or a camera scope shows it.
Granite Guyz runs a camera scope through existing drain lines before demo begins. The scope maps corrosion, root intrusion, and scale buildup. The data determines what stays and what gets replaced — before a slab saw is picked up. This eliminates the most common mid-project plumbing surprise: discovering a corroded drain line after demo is complete.
Polybutylene supply lines degrade from the inside and fail without warning — typically as a sudden burst rather than a slow leak. A kitchen remodel is the right time to replace them because the walls are already open. Granite Guyz replaces polybutylene with PEX-A as a standard scope item — not an add-on — in any home where it is present.
Once structural, electrical, and plumbing work is complete and inspected, the finish phase begins. In a DFW kitchen where the galley wall just came out and the room expanded from 80 to 200 square feet, the cabinet layout must be designed for the new space — not adapted from a box store grid. Granite Guyz manages finish selections during pre-construction, so material lead times are built into the schedule and nothing stalls the project at the cabinet delivery stage.

Semi-custom and custom cabinetry sized for the new layout. Custom fillers, corners, and appliance openings. Soft-close hinges, full-extension drawer slides, and dovetail drawer boxes standard on every install.

Quartz, granite, quartzite, and butcher block. All stone templated after cabinets are set and fabricated to exact dimensions. Quartz dominates the midrange market. Quartzite at the premium end.

Porcelain tile (most durable), LVP (moisture-resistant, fast install), and hardwood. All flooring installs on the leveled slab. Large-format tile requires the substrate survey completed earlier in the sequence.

Subway tile, patterned ceramic, and natural stone. Installs after countertops are set and plumbing fixtures are trimmed out. Material and grout selected during pre-construction to ensure availability.

Recessed LED cans replace the single center fluorescent. Under-cabinet task lighting on the countertop work surface. Pendants over the island. Every circuit is on a dedicated breaker and every lighting location on a dimmer.

Structural work, MEP, and every finish is managed under a single contract signed before demo starts. No separate subs, no change order surprises from coordination gaps.
Kitchen remodel pricing in DFW spans a wide range depending on scope, structural complexity, and finish tier. The bands below reflect real project costs Granite Guyz delivers consistently. Every project is scoped and priced in writing before work begins — Granite Guyz does not give ballpark numbers over the phone.
Costs shown are for the full kitchen scope including structural, MEP, and finish trades. Appliances are excluded unless otherwise specified. Wall removal costs from the structural section above are included in Tier 2 and Tier 3 projects where applicable.
New countertops, cabinet refacing or painting, hardware replacement, new sink and faucet, backsplash tile, and lighting fixtures. No structural work, no demo to studs, no MEP changes. Best suited to kitchens with good bones that simply need surface updates.
Complete demo, new electrical circuits and panel upgrade if required, plumbing rough-in including island drain if applicable, slab leveling, new cabinets, countertops, flooring, backsplash, and lighting. Does not include load-bearing wall removal.
Everything in Tier 2, plus structural engineering, temporary shoring, load-bearing wall removal, LVL or steel beam installation, inspected connections, and patch work. Adds $25K–$45K to the Tier 2 baseline depending on beam span and slab conditions at post locations.
All structural and MEP scope, plus custom cabinetry with inset doors, natural stone countertops (quartzite, marble), large-format tile throughout, designer fixtures, built-in appliance panels, and smart home integration. Premium selections drive cost to the upper range.
Contingency Budget: Every kitchen remodel should carry a 10%–15% contingency. In a 40-year-old DFW home, surprises discovered during demo — corroded drain line sections, termite damage in subfloor framing, mold behind the sink cabinet, double-layered drywall — cannot be priced until the walls are open. Granite Guyz documents every discovery and requires written authorization before any additional work begins. Nothing is added to scope verbally.
A kitchen remodel has more phases than most homeowners expect because inspections must occur between structural, electrical, plumbing, and insulation work before walls close. Granite Guyz provides a phase-by-phase timeline in writing at pre-construction, with milestone dates for each inspection and trade handoff. The sequence below applies to a full galley conversion with wall removal.
Scope finalized in writing. Material selections confirmed. Permits applied for. Engineering plans ordered. Cabinet lead times verified and locked.
Floor elevation survey across kitchen footprint. Slab conditions documented. Foundation engineer engaged if pier work is indicated.
Cabinets, flooring, drywall, and appliances removed. Camera scope run on all drain lines before any slab cuts. Existing conditions documented.
Temporary shoring installed. Load-bearing wall removed. Beam set per engineering drawings. Structural framing inspection passed.
Drain lines rerouted to new island or fixture locations. Slab patched and cured. Self-leveling or mortar bed correction applied per survey data.
Electrical, plumbing, and HVAC rough-in. All circuits run to new layout. Polybutylene replaced with PEX. All rough-in inspections passed before walls close.
Exterior walls spray-foamed. Insulation inspection passed. Window replacements installed and flashed.
Hang, tape, float, texture. New drywall on new framing. Smooth ceiling patches where shoring was removed.
Cabinets installed on level slab. Stone templated and fabricated. Countertops set. Plumbing trim-out begins after countertops are set.
Flooring installed on leveled substrate. Backsplash tile set after countertops. Grout and sealing complete.
Appliances installed. Fixtures trimmed out. Hardware set. Final electrical and plumbing inspections passed. Certificate of Occupancy issued.
A full galley conversion typically runs 8 to 14 weeks from permit pull to punch list. Projects with significant foundation work or custom cabinetry with long lead times run longer. Projects without wall removal typically run 6 to 10 weeks.
Granite Guyz remodels kitchens across six DFW municipalities. Each city has its own building department, permit review timeline, and zoning requirements. Each guide below adds city-specific context to the scope covered on this page.
Heavy concentration of 1970s–1990s ranch homes. Galley conversion demand is high. Many original 100-amp panels and cast iron drain lines still in service.
Carrollton Heights
Old Town
Josey Ranch
Wide range from post-war bungalows to 1980s builds in Far North Dallas. Historic overlay districts require additional review in some neighborhoods.
East Dallas
Lake Highlands
Preston Hollow
Predominantly 1980s–1990s suburban housing. HOA architectural review common in planned communities. Mature landscaping affects exterior wall openings.
West Plano
East Plano
Legacy
Newer construction (1995–2010) with active HOAs. Galley layouts less common but open-concept expansions into dining rooms are frequent requests.
Stonebriar
Panther Creek
The Hills
Heavy concentration of 1960s–1980s homes near the Telecom Corridor. Original galley layouts dominate. Slab settlement in Canyon Creek neighborhoods requires elevation surveys before every project.
Canyon Creek
Northrich
Spring Creek
Dense residential pockets alongside commercial corridors. 1970s–1980s housing stock. Smaller lot sizes mean kitchen expansions stay within the existing footprint in most cases.
North Addison
Quorum District
In the vast majority of DFW homes built between 1975 and 1995, yes. The wall separating the kitchen from the living or dining room typically carries the ceiling joists and runs parallel to the roof ridge — making it load-bearing. Removing it without engineering means the ceiling sags, the roof structure shifts, and cracked drywall follows within months. Granite Guyz engages a licensed structural engineer on every wall removal before demo begins. Engineering drawings and the inspection record stay with the house permanently.
Base cabinets are manufactured for level surfaces. DFW clay soil causes differential slab settlement over 40 years — sections heave, others settle, and the result is a floor that is often off-level by ½ to 1½ inches across the kitchen footprint. Shimming compensates for about a quarter inch. Beyond that, door alignment, drawer binding, countertop gaps at the wall, and large-format tile cracking are all inevitable without leveling the slab first. Granite Guyz runs a floor elevation survey before setting a single cabinet on every project.
In most 1980s DFW homes, the existing 100-amp panel does not have enough slots or capacity to support current NEC kitchen circuit requirements — two dedicated 20-amp GFCI countertop circuits, plus dedicated circuits for the refrigerator, dishwasher, disposal, and range. This is not an upsell — it is what code requires when the existing panel cannot support the work. The upgrade happens during electrical rough-in, before drywall closes, and everything is inspected before the walls close.
Granite Guyz runs a camera scope through existing drain lines before demo begins on every project. The scope maps corrosion, root intrusion, and scale buildup — determining what stays and what gets replaced before the first slab cut. For island sink additions, we cut the slab, reroute the drain, and patch. If the home has polybutylene supply lines (common in DFW from 1978 to 1995), those are replaced with PEX-A while the walls are already open. The scope report from the camera scope is provided to the homeowner before work begins.
A full galley conversion with wall removal, slab leveling, electrical upgrade, and complete finish-out typically runs 8 to 14 weeks from permit pull to punch list. Projects with significant foundation work or custom cabinetry with longer lead times run longer. Projects without wall removal typically run 6 to 10 weeks. Granite Guyz provides a phase-by-phase timeline in writing at pre-construction, with milestone dates for each inspection and trade handoff.
A cosmetic refresh (countertops, appliances, hardware) runs $15,000 to $35,000. A full remodel with no structural work runs $45,000 to $85,000. A galley conversion with wall removal adds $25,000 to $45,000 to the baseline depending on beam size, slab conditions, and electrical scope. High-end custom kitchens with premium stone, custom cabinetry, and full appliance packages run $100,000 to $200,000+. Every project is scoped and priced in writing before work begins. Granite Guyz does not give ballpark numbers over the phone.
We walk the kitchen before we answer questions about scope or cost. The house itself is the best source of information. Schedule a free walkthrough and we will tell you exactly what we see.